June 23: Aborted "Baseline" & TBF Temperature Change Test
Configuration:
- ACS: Fully Assembled
- Mounting: In TBF/Diamond with New Linear Bearing B-Latch
- Cooling: Chillers
- Optical Source: HRC Coronagraph Spot with Backlight; WFC RAS/Cal
- Starting Temp: Ambient at Start of Day
- Add'l Sensors: LVDTs to Monitor Motion of Bench Relative to Enclosure
Results:
- Had Planned to Run Long Duration Baseline for Comparison to RASHOMS Results
- WFC Over-Temp Forced WFC TECs to be Turned Off; Baseline Aborted
- Temp Change of TBF Bottom Support Post (20 to 30 to 20C) Caused WFC & HRC Motion
- Temp Change of +V2 Support Post (20 to 30 to 20C) Caused WFC & HRC Motion
- During Temp Changes B-Latch Load Cell Measured Changing Load (~30lb) and LVDTs Measured Motion of Enclosure & Bench Relative to TBF
Conclusion:
- TBF Temp Changes Causes TBF Length Change Causes Load Change Causes Enclosure/Bench Motion
- Y-Fitting "Stiction" Prevents Verification of Proper B-Latch Motion